NEBS Documents
NEBS criteria:
- Apply to personnel safety, protection of property, and operational continuity
- Cover both physical and electrical protection concerns
- Derive largely from national/international standards of FCC requirements
- Are unique in their focus on US telecommunications facility environment
The core NEBS documents are available as a set, FD-NEBS-01, NEBS™ Physical and Electrical Protection, which is offered at a 30% discount and includes:
- GR-63, NEBS™ Requirements: Physical Protection (includes a detailed heat dissipation calculation procedure for frame and shelf-level equipment)
- GR-1089, Electromagnetic Compatibility and Electrical Safety — Generic Criteria for Network Telecommunications Equipment
- SR-3580, NEBS Criteria Levels
Other NEBS related documents:
- GR-3160, NEBS™ Requirements for Telecommunications Data Center Equipment and Spaces
- SR-3580, NEBS Criteria Levels
- GR-1217, Generic Requirements for Separable Electrical Connectors Used in Telecommunications Hardware
- GR-78, Generic Requirements for the Physical Design and Manufacture of Telecommunications Products and Equipment
- GR-468, Generic Reliability Assurance Requirements for Optoelectronic Devices Used in Telecommunications Equipment
- GR-357, Generic Requirements for Assuring the Reliability of Components Used in Telecommunications Equipment
- GR-487, Generic Requirements for Electronic Equipment Cabinets
- GR-3028, Thermal Management In Telecommunications Central Offices: Thermal GR-3028
- GR-1221, Generic Reliability Assurance Requirements for Passive Optical Components
- GR-2930, Network Equipment Building System NEBS™ Raised Floor Generic Requirements for Network and Data Centers
- GR-2969, Generic Requirements for the Design and Manufacture of Short-Life Information Handling Products and Equipment
- ROADMAP-TO-NEBS-1, Telcordia Roadmap to NEBS Documents
- FR-NEBS-EQUIP-PROTECT-01, Network Equipment-Building System (NEBS™) Family of Requirements for Protecting Network Equipment
- FR-NEBS-PDRA, NEBS Physical Design and Reliability Assurance